15 Best Gantt Chart Software for Teams

[ez-toc]

Gantt chart software serves all teams that involve project managers together with developers, designers, marketing experts, and groups that need efficient project planning, scheduling, and tracking capabilities. Such tools present graphical representations of time sequences to enable teams to handle scheduling needs, distribute resources, and detect component connections. The appropriate Gantt chart software system delivers both collaborative benefits and workflow simplification and project performance enhancement benefits to organizations at any scale.  

Critical evaluation of the following 15 tools relied on their user-friendliness as well as their features alongside integrations and pricing models and scalability options, and sector compatibility. The assortment of software solutions matches project requirements, which range from the basic needs of minor groups to the advanced workflow management requirements of major businesses. Through their selection of Gantt chart solutions, the organizations receive automation alongside collaboration and reporting features to maintain their organization and achieve deadlines while maximizing productivity.

What is a Gantt Chart?

A Gantt chart is a graphical project management instrument used to plan, schedule, and monitor activities against time. It presents tasks as horizontal bars on a timeline with the end and start dates, dependencies, and progress. Its inventor is Henry Gantt, and it’s extensively used in project management to maximize workflow, assign resources, and oversee deadlines.

Gantt charts simplify projects, help to determine bottlenecks, and encourage effective teamwork. Gantt charts are of most value in managing complicated projects, constructing schedules, software programming, and marketing campaigns. Gantt charts give managers and teams a clear, organized picture of a project’s status, which allows them to remain on track and make adjustments to schedules when necessary to achieve project objectives successfully.

Criteria for Selecting Ideal Gantt Chart Software 

The right selection of Gantt chart software relies on some considerations to maintain correct project planning, task synchronization, and team collaboration. The following factors are utilized to choose the best tool for you:

1. Ease of Use: An easy-to-use interface, drag-and-drop functionality, and a zero or small learning curve are prerequisite requirements.

2 . Flexibility: The system allows users to adjust project timelines together with dependencies, milestones, and workflows based on shifting project requirements.

3. Collaboration: Products designed for collaboration enable teams to work together in real time by sharing files and offer facilities for group messaging as well as extended permissions according to roles.

4. Integration Ability: The software functions well with different programs which enables efficient project workflow through software integration and cloud storage abilities.

5. Scalability: Suits small groups best, growing organizations, and large corporations with high-level task complexity.

6. Automation & Notifications: Automated task execution, reminders, and task alerts in order to meet the highest possible level of productivity and deadline adherence.

7. Resource & Budget Management: Workload management features, member capacity tracking, and project spend tracking for decision-making in businesses.

8. Reporting & Analytics: Comprehensive reporting of project performance, percentage completion of tasks, and identification of bottlenecks.

9. Device Accessibility: Desktop, web, and mobile access to monitor projects remotely and receive alert notifications.

10. Pricing & Value for Money: Cost-effective with functionality to satisfy the project management requirement and budget limit.

Through such analysis, teams can select the most appropriate Gantt chart software that is ideal for their workflow to ensure a smooth and effective project process and productivity.

List of Top 15 Gantt Chart Software 

1. Microsoft Project

Gantt chart software - microsoft

Microsoft Project is a powerful project management tool for professional planning, scheduling, and tracking. It offers sophisticated Gantt charts, resource allocation, budgeting, and reporting features. With integration well into the Microsoft platform, teams can keep track of progress and manage dependencies efficiently. It is widely utilized for enterprise project planning and supports Agile, Waterfall, and hybrid methodologies. Though rich in features, it is harder to learn and more costly, so best suited for large enterprises and project managers with complex workflows.

Key Features:

  • Robust Gantt chart visualization
  • Resource allocation and tracking
  • Budget and cost management
  • Integration with Microsoft ecosystem

Pros:

  • Advanced project tracking and reporting
  • Ideal for large enterprise

Cons:

  • Steep learning curve
  • Expensive for small teams

Pricing:

Starts at $10/user/month

Who Should Use It?

Large enterprises and experienced project managers.

2. Smartsheet

Gantt chart software - smartsheet

Smartsheet is an online collaboration and project management software with interactive Gantt charts that allow scheduling and tracking of tasks. It marries spreadsheets with reporting, automation, and file sharing to make it extremely versatile. Workflow can be streamlined, dependencies can be managed, and integrations with tools such as Slack, Google Drive, and Microsoft Teams are supported. Smartsheet is well-suited for marketing, IT, and operations teams due to its versatility, but initial users will encounter a learning curve. Its scalable pricing renders it a strong option for both large and small businesses.

Key Features:

  • Customizable Gantt charts
  • Automated workflows
  • File sharing and real-time collaboration

Pros:

  • User-friendly interface
  • Strong automation capabilitie

Cons:

  • Limited offline functionality
  • Can be costly for smaller teams

Pricing:

Starts at $9/user/month

Who Should Use It?

Teams needing collaboration and automation tools.

3. Monday.com

Gantt chart software - monday.com

Monday.com is also a highly flexible project management tool with Gantt charts to schedule project timelines. It offers automation, integrations, Kanban boards, and resource planning, thus best for tracking workflows and tasks. Teams can personalize dashboards, add dependencies, and automate repetitive work. Monday.com features an intuitive interface and is highly scalable, thus best for startups, agencies, and enterprises. However, some sophisticated features cost more in their plans, and elaborate configurations will require initial training. Its accommodating and relaxed style suits it as the go-to preference for change-agile teams.

Key Features:

  • Drag-and-drop Gantt chart builder
  • Custom workflows and automation
  • Integration with multiple third-party apps

Pros:

  • Intuitive and visually appealing
  • Strong integration option

Cons:

  • Limited reporting capabilities
  • Can become expensive with more features

Pricing:

Starts at $9/user/month

Who Should Use It?

Teams looking for a flexible, easy-to-use project management tool.

4. Asana

Gantt chart software - asana

Asana is an easy-to-use task and workflow management tool that includes a timeline (Gantt chart) display to assist teams in visualizing deadlines and dependencies. It offers task assignment, milestone tracking, automation, and integrations with common apps such as Slack, Google Drive, and Zoom. Asana is a good fit for marketing, product, and remote teams looking for easy-to-use workflow management. Although it provides robust collaboration capabilities, its free plan has some limitations, and complicated projects might need manual organization. Asana is an excellent pick for well-organized teams handling several tasks.

Key Features:

  • Task dependencies and milestones
  • Customizable project views
  • Collaboration and integration tools

Pros:

  • Easy to use and adopt
  • Free plan available

Cons:

  • Lacks built-in budgeting features
  • Can be overwhelming for complex projects

Pricing:

Free plan; Paid plans start at $10.99/user/month

Who Should Use It?

Small to medium-sized teams managing multiple projects.

5. Trello (with Power-Ups)

Gantt chart software - trello

Trello is a basic, Kanban-style project management software that can be made better using Power-Ups such as Gantt chart extensions. Its drag-and-drop feature, task delegation, and labeling make it easy for beginners. Through Gantt chart add-ons such as BigPicture or Placker, the dependencies and timelines can be organized by users. Trello is ideal for small teams, startups, and individuals but might require other integrations for large teams. Though it has ease of use and affordability, its standard edition is missing features of advanced tracking and reporting in other tools.

Key Features:

Pros:

  • Highly visual and intuitive
  • Free plan available

Cons:

  • Limited reporting features
  • Gantt charts require third-party integrations

Pricing:

Free plan; Paid plans start at $5/user/month

Who Should Use It?

Small teams and startups using Kanban workflows.

6. ClickUp

Gantt chart software - clickup

ClickUp is a one-stop project management software with Gantt charts, Kanban boards, calendars, and automation. It has goal tracking, workload organization, task linking, and live collaboration. ClickUp is ideal for agencies, developers, and businesses because it has powerful customization capabilities. Despite having a feature-loaded design, the interface can overwhelm new users, and some high-end features are in higher-priced plans. ClickUp’s affordability, free plan, and flexibility make it a great option for teams seeking an all-around project management tool

Key Features:

  • Multiple project views (Gantt, Kanban, List)
  • Time tracking and workload management
  • Strong integration options

Pros:

  • Affordable with a feature-rich free plan
  • Highly customizable workflows

Cons:

  • Can be overwhelming for new users
  • Performance issues with large data sets

Pricing:

Free plan; Paid plans start at $5/user/month

Who Should Use It?

Teams looking for a cost-effective, versatile project management tool.

7. Wrike

Gantt chart software - wrike

Wrike is a project management team tool that offers Gantt charts, real-time reporting, and automation to make work smoother. Wrike has support for task dependencies, time tracking, and sharing documents, and therefore is a great option for enterprise, IT, and marketing teams. Wrike’s scalability and integration with applications like Slack and Salesforce make it ideal for optimizing team productivity. Its learning curve and pricing scheme for its more advanced features may not be suited for small businesses. It’s best for groups that need extensive collaboration features and detailed project monitoring.

Key Features:

  • Dynamic timeline and dependency tracking
  • Task prioritization and automation
  • Advanced reporting and analytics

Pros:

  • Strong collaboration features
  • Scalable for large teams

Cons:

  • Expensive for small businesses
  • Learning curve for new users

Pricing:

Starts at $9.80/user/month

Who Should Use It?

Medium to large teams needing robust project tracking.

8. TeamGantt

Gantt chart software - teamgantt

TeamGantt is an expert Gantt chart software that keeps project planning and scheduling straightforward. It enables teams to drag and drop tasks, monitor progress, handle dependencies, and collaborate in real-time. Unlike complicated project management software, TeamGantt has an intuitive interface but no sophisticated automation and reporting capabilities of competing software. It’s perfect for small enterprises, creative teams, and freelancers who want to have a simple-to-use scheduling tool without the distraction of other project management functionality.

Key Features:

  • Simple drag-and-drop interface
  • Collaboration and file sharing
  • Time tracking and workload management

Pros:

  • Easy to use
  • Great for visual project tracking

Cons:

  • Limited advanced features
  • No built-in budgeting tools

Pricing:

Starts at $59/user/month

Who Should Use It?

Teams that primarily use Gantt charts for planning.

9. Zoho Projects

Gantt chart software - zoho

Zoho Projects is an affordable project management tool with Gantt charts, time tracking, dependencies, and automation. It comes integrated with the Zoho ecosystem (CRM, Finance, Desk) and third-party apps. With robust customization and affordability, it’s excellent for small and medium businesses as well as remote teams. Yet, its UI might look a bit dated, and scalability isn’t as robust as enterprise solutions. Zoho Projects is ideal for companies that are already using Zoho applications or require a low-cost planning tool.

Key Features:

  • Task dependencies and milestones
  • Time tracking and invoicing
  • Customizable dashboards

Pros:

  • Affordable pricing
  • Strong integration with Zoho apps

Cons:

  • Interface can feel outdated
  • Limited third-party integrations

Pricing:

Free plan; Paid plans Starts at ₹350/user/month

Who Should Use It?

Businesses that are already using Zoho’s suite of tools.

10. GanttPRO

Gantt chart software - ganttpro

GanttPRO is a full-featured, specialized Gantt chart application with a user-friendly interface. It offers task scheduling, workload planning, dependencies, and collaboration features. Unlike generic project management software, GanttPRO specializes in Gantt chart features, which makes it perfect for teams requiring accurate scheduling. It doesn’t have generic project management features such as advanced automation. It’s perfect for construction, engineering, and software development teams handling complex projects.

Key Features:

  • Easy drag-and-drop scheduling
  • Resource management tools
  • Collaboration and file sharing

Pros:

  • User-friendly interface
  • Strong visualization tools

Cons:

  • No free plan
  • Limited third-party integrations

Pricing:

Starts at $7.90/user/month

Who Should Use It?

Teams and businesses needing a dedicated Gantt chart tool.

11. ProofHub

Gantt chart software - proofhub

ProofHub is a team collaboration project management tool with Gantt charts, task lists, and live discussions. It has file sharing, approvals, and time tracking, which is suitable for creative teams, marketing agencies, and businesses. Though it has unlimited users on a flat rate, its limited advanced automation and integrations can be a scalability limitation. ProofHub is ideal for teams that require a simple, centralized platform for planning and communicating projects.

Key Features:

  • Task dependencies and milestones
  • Real-time collaboration and discussions
  • Custom project workflows

Pros:

  • No per-user pricing
  • Simple and easy to use

Cons:

  • Fewer third-party integrations
  • Limited advanced reporting

Pricing:

Starts at $45/month (flat pricing)

Who Should Use It?

Businesses are looking for a simple, cost-effective collaboration tool.

12. ProjectManager.com

Gantt chart software - project manager

ProjectManager.com is a cloud-based project planning tool with Gantt charts, real-time tracking, and budget forecasting. It assists teams in assigning tasks, deadlines, and workload analysis. Although it has robust enterprise-level project management features, its cost might be prohibitive for small businesses. Suitable for large teams and enterprises with complex projects, it caters to construction, IT, and marketing teams that need detailed planning tools.

Key Features:

  • Real-time task tracking
  • Budget and resource management
  • Customizable dashboard

Pros:

  • Comprehensive reporting tools
  • Strong team collaboration features

Cons:

  • Pricing can be high for small teams
  • Can be complex to set up

Pricing:

Starts at $28/user/month

Who Should Use It?

Large teams requiring advanced project tracking and reporting.

13. nTask

Gantt chart software - ntask

nTask is a project and task management tool that is intended for freelancers, startups, and small teams. It has Gantt charts, time tracking, issue tracking, and risk management, which are comprehensive features for project planning. It also has team collaboration, workflow automation, and meeting management support. Its price point is low, and its interface is easy to use, making it easy to operate for newcomers. However, limited third-party integrations and basic reporting capabilities might not be ideal for big businesses or enterprises that need advanced project analytics.

Key Features:

  • Interactive Gantt charts for visual project tracking
  • Task dependencies and milestones
  • Time tracking and timesheets
  • Collaboration tools with file sharing and comments

Pros:

  • Affordable pricing with extensive features
  • Simple interface, suitable for beginners

Cons:

  • Limited integrations compared to competitors
  • Advanced reporting features could be improved

Pricing:

Free plan available and Premium starts at $4/month per user

Who Should Use It?

Freelancers, small teams, and startups looking for an easy-to-use Gantt chart tool with task management capabilities.

14. Hive

Gantt chart software - hive

Hive is an artificial intelligence-powered project and workflow management tool with Gantt charts, Kanban boards, time tracking, and automation. Hive enables teams to track tasks, collaborate in real time, and derive insights from AI-based analytics. Best suited for marketing teams, remote teams, and enterprises, Hive simplifies communication and productivity. Although it provides robust automation and strong integrations, the tool can be expensive for larger teams, and its feature-dense interface can be overwhelming for beginners to master

Key Features:

  • Gantt, Kanban, and calendar views
  • Task automation and workflow customization
  • Built-in time tracking and analytics
  • Messaging and email integration
  • AI-powered project summaries

Pros:

  • Intuitive UI with multiple project views
  • Strong team collaboration and automation features

Cons:

  • Can be expensive for larger teams
  • Occasional performance issues with large projects

Pricing:

Free plan available and paid plans start at $1/month per user

Who Should Use It?

Marketing teams, agencies, and businesses needing a flexible project management tool with automation and collaboration features.

15. Redbooth

Gantt chart software - redbooth

Redbooth is a very simple and intuitive project management tool that offers Gantt charts, task delegation, workload tracking, and built-in video conferencing. It’s ideal for small businesses, startups, and teams looking for a lightweight project-planning solution. It has a clean interface and is easy to use, making it great for beginners. Though it doesn’t have high-level automation and detailed reporting functionalities, it isn’t appropriate for complex projects or business companies requiring deeper analysis and connections to other business applications

Key Features:

  • Task management with due dates and priorities
  • Built-in Gantt charts for scheduling
  • Time tracking and productivity reporting
  • Team chat and video conferencing integration
  • Mobile and desktop apps

Pros:

  • Easy to use with a clean, intuitive design
  • Strong collaboration tools with built-in communication features

Cons:

  • Lacks advanced project management features
  • Limited third-party integrations

Pricing:

Free plan available; Paid plans start at $9/month per user

Who Should Use It?

Small teams, startups, and remote teams need a lightweight Gantt chart tool with built-in collaboration features.

Comparison Between Gantt Chart Software 

Here’s a comparison table of the top Gantt Chart software, including features, pricing, use cases, and websites.

SoftwareKey FeaturesPricingBest ForWebsite
Microsoft ProjectAdvanced project scheduling, resource management, integrations with Microsoft 365Starts at ₹ 689.00/user/monthLarge enterprises, complex project planningmicrosoft.com
SmartsheetCloud-based collaboration, automation, integrations with apps like Slack & JiraStarts at $9/user/monthTeams needing workflow automation & reportingsmartsheet.com
Monday.comCustomizable workflows, timeline & Gantt views, automationStarts at $9/user/monthTeams looking for a flexible project management toolmonday.com
AsanaTask dependencies, timeline view, collaboration toolsFree plan available, paid from $10.99/user/monthTeams managing tasks with a visual approachasana.com
Trello (Power-Ups)Kanban boards, Gantt chart add-ons, automationFree plan available, paid Power-Ups from $5/monthSimple task management & visual trackingtrello.com
ClickUpGantt charts, goal tracking, automation, integrationsFree plan available, paid from $10/user/monthStartups & businesses needing an all-in-one PM toolclickup.com
WrikeGantt charts, workload tracking, custom workflowsFree plan available, paid from $10/user/monthMarketing & professional service teamswrike.com
TeamGanttDrag-and-drop Gantt chart builder, collaboration toolsFree plan available, paid from $59/monthSmall teams & agencies managing simple projectsteamgantt.com
Zoho ProjectsTask automation, dependencies, time trackingStarts at ₹350/user/monthBusinesses using Zoho ecosystemzoho.com
GanttPROOnline Gantt charts, task planning, team collaborationStarts at $7.99/user/monthTeams needing intuitive Gantt chartsganttpro.com
ProofHubGantt charts, team chat, project discussionsStarts at $45/month (flat rate)Businesses needing all-in-one project collaborationproofhub.com
ProjectManager.comOnline Gantt charts, workload tracking, reportingStarts at $28/user/monthEnterprises & large teams with complex projectsprojectmanager.com
nTaskGantt charts, task management, risk trackingFree plan available, paid from $4/user/monthFreelancers & small teamsntaskmanager.com
HiveGantt charts, AI-powered automation, collaborationStarts at $1/user/monthRemote teams & marketing teamshive.com
RedboothSimple Gantt charts, task management, video callsStarts at $9/user/monthSmall businesses & startupsredbooth.com

Conclusion 

The management of tasks through projects heavily depends on Gantt chart software which provides visual display for timelines coupled with dependency tracking and progress tracking capabilities. The enterprise-level planning requirement of Microsoft Project and Smartsheet matches up with the advanced planning needs of businesses whereas Monday.com and ClickUp provide flexibility to expanding teams. 

Users who want a straightforward Gantt chart application can select from TeamGantt or GanttPRO because they offer intuitive Gantt chart functions. Companies which need their productivity tools to work together should choose Asana, Trello, and Hive. Startups together with freelancers can choose between nTask and Redbooth and Zoho Projects since these tools deliver both affordability and ease of use. 

Control experts managing teams across different units should use the collaboration functionality offered by Wrike and ProofHub. A Gantt chart tool fits optimally to a project because its selection criteria should identify team dimensions together with task intricacy and required integration capabilities so workflows operate effectively toward project success.

FAQs 

1. What is Gantt chart software used for?

Gantt chart software facilitates project planning, task scheduling, and progress tracking via visual timelines. It enables teams to establish dependencies, set deadlines, and optimize resource allocation.

2. Which industries benefit most from Gantt chart software?

Industries like construction, IT, marketing, manufacturing, and event planning utilize Gantt charts to coordinate complex projects, manage teams, and optimize workflows.

3. What are the key features I should look for in Gantt chart software?

The most important features are task dependencies, drag-and-drop scheduling, collaboration tools, real-time updates, reporting, and integrations with other project management apps.

4. Is Gantt chart software appropriate for small teams and freelancers?

Yes, numerous applications such as nTask, Redbooth, and ClickUp provide lean, inexpensive Gantt chart software that is well-suited for freelancers and small teams.

5. What is the best Gantt chart software for large enterprises?

Microsoft Project, Smartsheet, and Wrike are suitable for big organizations because they are scalable, support resource management, and have robust reporting capabilities.

Get a free consultation!